optimized for 1024x768

beirak y ulanosky arquitectos

english

english

español

español
PATAS ARRIBA PRIMARY SCHOOL

Location: Rivas–Vaciamadrid. Madrid. Spain
Promoter: Rivas–Vaciamadrid City Council
Area: 1223,90 square meters
Total budget: 1.296.125,84 €
Project drafting: June 2003
Work execution: November 2003-July 2004
Construction company: Constructora Avalos SA
Structures calculation: Sergio Zabala, Architect
Geotechnics: Cones SA
Execution direction: Carlos Rincón, Technical Architect

 It is destined to children from 0 to 3 years old. This one-storey building is structured according to two orthogonal geometries in which the lecture rooms and rooms for different uses are located, defining inside and outside several spaces of informal circulation, games and stay. The exterior areas are zoned according to the use and age, including a little children´s theatre. The brick can be seen in contrast with the color of the metallic elements. The workshops have been projected as an indefinite constant lintel series and variable height.

www.byuarquitectos.com